Building for the Future - Overview of Developments


Picture of the new Renal Unit

Renal Unit

Building for the Future

Your New Ulster Hospital

Maternity Unit

The key features of the developments are:
  • To provide modern, state of the art hospital facilities within a fully tailored and flexible design for the use of patients, staff and visitors
  • Create a focus for integrated delivery of high quality acute hospital services for East Belfast, North Down, Ards and Castlereagh area
  • Meets national standards for patient privacy and dignity
  • Construction programme complete by 2015/2016
The key benefits of the developments are:
  • Secure sustainable improvements in health for the residents of East Belfast, North Down, Ards and Castlereagh
  • Support the delivery of key health targets, improve outcomes and reduce waiting times for treatment
  • Provide ‘fit for purpose’ facilities which support the delivery of patient centred healthcare in a significantly enhanced environment
  • Optimal clinical and functional adjacencies ensure flexibility of use of both in the short and long term, thus ensuring that the facility is utilised to maximum efficiency
  • Improve access for disabled patients and staff through full DDA compliance
  • Improve prospects for recruitment and retention of staff and offer enhanced opportunities for continued professional development
  • Making the most efficient use of the existing site thus maximising scope for further expansion whilst also making available much of the minimally developed Health Estates land
Phase A – Overview

Phase A programme promises to develop a number of crucial key services to new modern standards. Construction began in 2005 and the first development, the new Renal Unit, opened to patients in November 2006.

The programme for Phase A is as follows:

Project

Description

Construction Dates

Renal Unit

40 stations

Opened November 2006

Maternity Unit

39 beds including a 7 bed ‘home from home’ midwifery led unit, day obstetric unit, 5 room delivery suite, 2 obstetric theatres and outpatient facilities

Complete September 2007

Terraced Car Park

500 spaces

Opened March 2007

Main Stores

Replacement

Opened January 2007

Refurbishment and extension to Elderly Care Department

Includes provision for 3 x 19 bed wards and 3 x 20 bed wards

Complete August 2008

Critical Care Complex

7 new theatres, 16 critical care beds, laboratories and a sterile services department

Start April 2007

Complete May 2010

Phase A - Map of Site

Phase A – Map of Site

Phase B - Overview

Work has been ongoing since December 2005 to develop a conceptual design for Phase B and new models of care for future services. The preferred option for Phase B incorporates the following elements:

  • A new emergency department and radiology department with a ward block above forming a single building sitting along side the critical care accommodation developed as part of Phase A
  • A new acute treatment centre incorporating day surgery, outpatients and a clinical investigations unit
  • A new Children’s Hospital incorporating inpatient and outpatient care

The programme for Phase B is as follows:

Project

Description

Construction Dates

Phase B1

(Preparatory Phase)

Site preparation

Construction of new laundry, workshops and site infrastructure including provision of temporary plant

Start 2009

Complete 2010

Phase B2

(Principle phase)

Construct 7 storey building to accommodate:

Wards

Emergency Department

Imaging

Support Services

Start 2010

Complete 2012

Phase B3

(Final phase)

Construct Acute Treatment Centre and Children’s Unit

Start 2012

Complete 2014

Phase B - Artists impression of Site

Phase B – Artists Impression of Site